Altherma 3 LT Monobloc Standard Installation Level 2 (R32) DUK-H12 3 places left

Objectives

Level one training must be completed prior to booking on level two

Installation requirements

Start up procedures

Proof of a negative lateral flow test will need to be provided upon arrival.

Please aim to arrive at the venue 30 minutes before the start time.

Programme

Controller basics

Structure of installer settings (breadcrumbs and overview)

Stand By Me E-Configurator tool

Options considerations

Pump Delta T and Flow rates

2 Port Valve Zone control

Dual Setpoint control

DHW Secondary Circulation

Options Box requirements

Bivalent Systems

Electric Meters

Alarm Outputs

Cooling options and Heat Pump Convectors

Smart Comfort Controller Basics and Residential controller App

D-Com Gateway Basics

Common Field Settings

COURSE DETAILS

img17 November 2021 09:00 am start

img£150

imgInstallation and commissioning engineers

img1 Day

imgBristol

Can't find what you're looking for? Request additional training dates