Installation requirements
Start up procedures
This course will include short quiz questions at the end of each session, it will also include a final course assessment bank of questions at the end of the session 4.
Successful candidates will receive a certificate of successful completion.
This course will be delivered over a Microsoft Teams meeting. You will receive 1 calendar invite for the 4 short sessions required to be completed closer to the start date.
PLEASE NOTE: The DUK-SE15 on line Altherma product introduction course must have been successfully completed prior to being able to register to attend this course.
Session 1 - 9am 25/02/21
· Manuals and abbreviations
· HT Hydro Split concept
· Range Overview
· Options
· Hardware installation
o Outdoor Unit
o Hydro Box
o Domestic Hot Water Cylinder
· Session 1 quiz questions
Session 2 - 11am 25/02/21
· Session 1 quiz answers
· Main electrical supply requirements
· Common Installation wiring
o Outdoor Unit
o Outdoor Unit to Hydro Box
o Back Up Heater wiring
o Booster Heater wiring
o Basic Control Box Wiring (including third party controls)
o Domestic Hot Water cylinder wiring and connections to Hydro Box
· Session 2 quiz questions
Session 3 - 9am 26/02/21
· Session 2 quiz answers
· System Hydraulics
o External Pipework
o Required flow rates
o Automatic By-Pass Valve
o Defrost volumes
o Hydraulic separation
o Esbe valve
· Session 3 quiz questions
Session 4 - 11am 26/02/21
· Session 3 quiz answers
· Water Quality
· Expansion vessel charge
· Glycol
· Pre- start checks
o Domestic Hot Water cylinder
· Daikin MMI basics
· System deaeration
· Daikin Madoka basics
· End of course quiz questions
25 February 2021 09:00 am start
£0
Installation and commissioning engineers
6 Hours
Live Streaming Training
Can't find what you're looking for? Request additional training dates